-
Notifications
You must be signed in to change notification settings - Fork 10
Teleconference 5.10.2022
Marijana Crepulja edited this page Oct 10, 2022
·
8 revisions
- Opening and approval of agenda
- Secretariat updates
- Review of GRIB proposals
- Review of BUFR proposals
- Review of Common Code Tables proposals
- Schedule of FT2023-1
- AOB
- The team discussed the following proposals. All notes are in the comment section of each issue.
- Antoine presented new proposal from Eumetsat (issue to be submitted)
The list of issues proposed so far, divided into substantial ones and those with editorial nature.
No. | GRIB2 | Issue | Assignee |
---|---|---|---|
1. | Issue 170 | New Fire parameters in Code Table 4.2, discipline 2, category 4 Fire weather products | Sebastien |
2. | Issue 171 | New section 4 templates to encode optical products at a particular wavelength or for a particular wavelength range | Sebastien |
The list of issues under consideration, divided into substantial ones and those with editorial nature.
No. | BUFR4 | Issue | Assignee |
---|---|---|---|
1. | Issue 136 | Proposal for new BUFR table entries for EPS-SG : MWI, ICI, SCA, IAS 1, MWS | Antoine |
The list of issues under consideration, divided into substantial ones and those with editorial nature.
No. | CCT | Issue | Assignee |
---|
- When a new proposal (issue) is created, the issue is generally assigned to the person who makes the proposal and put in "submitted" status.
- Once the team agrees to the general approach and decides to go to validation status, chair moves the issue to "in validation" status and the Secretariat creates a branch. If further discussion is necessary, the issue is moved to "in discussion" status.
- Once the team agrees to the final proposal, asignee consolidates the finalized the proposal in the original post, updates the branch, and post a comment saying "branch updated" with mention to Chair and the Secretariat. (Please do not change issue status.)
- Chair confirms that the proposal is finalized and the associated branch is updated, and moved the issue to the "validated" status.
- One-hour meeting to confirm schedule: September 22, 11-12 UTC
- Deadline for submission of proposals: October 3
- Two 2-hour meetings to review new proposals: October 4-5, 12-14 UTC
- Two 2-hour meetings to conclude the proposals: November 1, 11-13 UTC and November 2, 12-14 UTC
- Deadline for validation (if not completed by the meeting above): December 2
- Two 2-hour meetings to finalize remaining issues if necessary : December 6-7, 12-14 UTC
- Finalize all proposals - mid January 2023
- National Focal Point review: first of February 2023
- WMO adoption process: first of April 2023
- Codes are officially operational: mid-May 2023
No. | Name | Agency | October 5 |
---|---|---|---|
1 | Jeffrey ATOR | NOAA | x |
2 | Marijana CREPULJA | ECMWF | |
3 | Simon Stuart ELLIOTT | EUMETSAT | X |
4 | Sergio Henrique Soares FERREIRA | National Institute for Space Research, Brazil | X |
5 | Tom KRALIDIS | Environment and Climate Change Canada | |
6 | Sibylle KREBBER | DWD | X |
7 | Abderrazak LEMKHENTER | Météo Maroc | |
8 | Marian MAJAN | HMEI | |
9 | Sébastien VILLAUME | ECMWF | X |
10 | Richard WEEDON | Met office | |
11 | XUE Lei | CMA | |
12 | Antoine MERLE | EUMETSAT | X |
13 | Enrico FUCILE | WMO Secretariat | |
14 | Anna MILAN | WMO Secretariat | X |
15 | David BERRY | WMO Secretariat |