Skip to content

Merge pull request #20 from zenodeapp/genesis-v1.0.0 #27

Merge pull request #20 from zenodeapp/genesis-v1.0.0

Merge pull request #20 from zenodeapp/genesis-v1.0.0 #27

Triggered via push January 18, 2024 11:26
Status Failure
Total duration 6m 29s
Artifacts 1

test.yml

on: push
Matrix: integration_tests
Matrix: upload-cache
Fit to window
Zoom out
Zoom in

Annotations

11 errors
integration_tests (ibc_update_client)
Process completed with exit code 2.
integration_tests (ibc_timeout)
The job was canceled because "ibc_update_client" failed.
integration_tests (ibc_timeout)
Process completed with exit code 2.
integration_tests (ibc)
The job was canceled because "ibc_update_client" failed.
integration_tests (ibc)
Process completed with exit code 2.
integration_tests (slow)
The job was canceled because "ibc_update_client" failed.
integration_tests (slow)
The operation was canceled.
integration_tests (upgrade)
The job was canceled because "ibc_update_client" failed.
integration_tests (upgrade)
The operation was canceled.
integration_tests (unmarked)
The job was canceled because "ibc_update_client" failed.
integration_tests (unmarked)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
debug-files Expired
111 KB