Skip to content

Fedora Copr build

Fedora Copr build #7

Triggered via schedule May 16, 2024 00:51
Status Failure
Total duration 6h 0m 25s
Artifacts

copr-builds.yml

on: schedule
Matrix: RPM package
Fit to window
Zoom out
Zoom in

Annotations

4 errors
RPM package (mock-core-configs)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 360 minutes.
RPM package (mock-core-configs)
The operation was canceled.
RPM package (mock)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 360 minutes.
RPM package (mock)
The operation was canceled.