Skip to content

chore: switch to official upstream images #578

chore: switch to official upstream images

chore: switch to official upstream images #578

Triggered via pull request December 2, 2024 19:43
Status Cancelled
Total duration 15s
Artifacts

build-40.yml

on: pull_request
Matrix: build / main
build  /  Check all ${{ inputs.fedora_version }} builds successful
0s
build / Check all ${{ inputs.fedora_version }} builds successful
Fit to window
Zoom out
Zoom in

Annotations

14 errors
build / main (40, kinoite)
The run was canceled by @p5.
build / main (40, kinoite)
The operation was canceled.
build / main (40, base)
The run was canceled by @p5.
build / main (40, base)
A task was canceled.
build / main (40, sericea)
The run was canceled by @p5.
build / main (40, sericea)
The operation was canceled.
build / main (40, onyx)
The run was canceled by @p5.
build / main (40, onyx)
The operation was canceled.
build / main (40, lazurite)
The run was canceled by @p5.
build / main (40, lazurite)
The operation was canceled.
build / main (40, silverblue)
The run was canceled by @p5.
build / main (40, silverblue)
A task was canceled.
build / main (40, vauxite)
The run was canceled by @p5.
build / main (40, vauxite)
A task was canceled.