chore(deps): update registry.access.redhat.com/ubi9/go-toolset docker tag to v9 #437
Red Hat Konflux / Red Hat Konflux / o11y-on-pull-request
failed
Dec 17, 2024 in 2m 28s
Failed
Red Hat Konflux/o11y-on-pull-request has failed.
Details
- Namespace: rhtap-o11y-tenant
- PipelineRun: o11y-on-pull-request-tdvbx
Task Statuses:
Status | Duration | Name |
---|---|---|
✅ Succeeded | 5 seconds | |
✅ Succeeded | 13 seconds | |
✅ Succeeded | 1 minute | |
✅ Succeeded | 22 seconds | |
✅ Succeeded | 1 minute | |
✅ Succeeded | 1 minute | |
✅ Succeeded | 7 seconds | |
✅ Succeeded | 6 seconds | |
✅ Succeeded | 24 seconds | |
❌ Failed | 1 minute | |
✅ Succeeded | 5 seconds |
Failure snippet:
task build-container has the status "Failed":subprocess exited with status 1 subprocess exited with status 1 Error: building at STEP "RUN CGO_ENABLED=0 GOOS=linux go build -o /bin/exporters .": exit status 1
Loading