ci: add code coverage #7
ci.yml
on: pull_request
lint
13s
build
1m 27s
unit-tests
1m 27s
coverage
1m 45s
contract-integration-tests
1m 29s
parachain-integration-tests
1m 27s
Annotations
10 errors
build
The run was canceled by @evilrobot-01.
|
build
The operation was canceled.
|
unit-tests
The run was canceled by @evilrobot-01.
|
unit-tests
The operation was canceled.
|
parachain-integration-tests
The run was canceled by @evilrobot-01.
|
parachain-integration-tests
The operation was canceled.
|
contract-integration-tests
The run was canceled by @evilrobot-01.
|
contract-integration-tests
The operation was canceled.
|
coverage
The run was canceled by @evilrobot-01.
|
coverage
The operation was canceled.
|