Skip to content

schedule check and dispatch #1847

schedule check and dispatch

schedule check and dispatch #1847

Triggered via schedule October 28, 2024 01:32
Status Cancelled
Total duration 4m 25s
Artifacts
populate-matrix
1m 7s
populate-matrix
Matrix: call-update-and-rebuild
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 4 warnings
call-update-and-rebuild (origin/main) / build
Process completed with exit code 101.
call-update-and-rebuild (v26.0.2) / build
FailFast: cancelling since parallel instance has failed
call-update-and-rebuild (v26.0.2) / build
Process completed with exit code 101.
call-update-and-rebuild (origin/v26.x) / build
FailFast: cancelling since parallel instance has failed
call-update-and-rebuild (origin/v26.x) / build
The operation was canceled.
populate-matrix
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
call-update-and-rebuild (origin/main) / build
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/setup-go@v3, actions/checkout@v3, actions/cache@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
call-update-and-rebuild (origin/v26.x) / build
Failed to download action 'https://api.github.com/repos/actions/setup-go/tarball/6edd4406fa81c3da01a34fa6f6343087c207a568'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
call-update-and-rebuild (origin/v26.x) / build
Back off 14.095 seconds before retry.