chore(deps): update operator-next-proxy to 6f30230 #1195
Red Hat Konflux / Red Hat Konflux / operator-next-e2e-tektoncd-pipelines / operator-next-bundle
failed
Dec 19, 2024 in 30m 52s
Failed
Integration test for snapshot operator-next-ncpwz and scenario operator-next-e2e-tektoncd-pipelines has failed
Details
- Pipelinerun: operator-next-e2e-tektoncd-pipelines-mgmpm
Task | Duration | Test Suite | Status | Details |
---|---|---|---|---|
parse-metadata | 5s | ✔️ Reason: Succeeded | ✔️ Reason: Succeeded | |
provision-eaas-space | 14s | ✔️ Reason: Succeeded | ✔️ Reason: Succeeded | |
provision-cluster | 30m26s | ❌ Reason: Failed | ❌ Reason: Failed |
Loading