Skip to content

Post-release administrivia #1

Post-release administrivia

Post-release administrivia #1

Triggered via push April 21, 2024 15:29
Status Failure
Total duration 6h 0m 24s
Artifacts

copr-builds.yml

on: push
Matrix: RPM package
Fit to window
Zoom out
Zoom in

Annotations

4 errors
RPM package (mock-core-configs)
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 360 minutes.
RPM package (mock-core-configs)
The operation was canceled.
RPM package (mock)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
RPM package (mock)
The operation was canceled.