Update Konflux references #34
Open
Red Hat Konflux / Red Hat Konflux / bazel5-ubi8-on-pull-request
failed
Jan 4, 2025 in 2h 0m 0s
Failed
Red Hat Konflux/bazel5-ubi8-on-pull-request has failed.
Details
- Namespace: konflux-build-pipeli-tenant
- PipelineRun: bazel5-ubi8-on-pull-request-gvjgf
Task Statuses:
Status | Duration | Name |
---|---|---|
β Succeeded | 17 minutes | |
β Succeeded | 15 seconds | |
β Succeeded | 4 minutes | |
β Succeeded | 20 minutes | |
β Succeeded | 1 hour | |
β Succeeded | 40 minutes | |
β Succeeded | 17 seconds | |
β Succeeded | 8 seconds | |
β Failed | 6 minutes | |
β Succeeded | 9 seconds | |
β Succeeded | 8 seconds | |
β Succeeded | 3 minutes | |
β Succeeded | 17 seconds | |
β Succeeded | 1 minute | |
β Succeeded | 1 minute |
Failure snippet:
task clamav-scan has the status "TaskRunCancelled":TaskRun "bazel5-ubi8-on-pull-request-gvjgf-clamav-scan" was cancelled. TaskRun cancelled as the PipelineRun it belongs to has timed out.
Loading