Skip to content

build(deps): bump the minor-and-patch group across 1 directory with 25 updates #37

build(deps): bump the minor-and-patch group across 1 directory with 25 updates

build(deps): bump the minor-and-patch group across 1 directory with 25 updates #37

Triggered via pull request September 1, 2024 02:17
Status Failure
Total duration 2m 28s
Artifacts

horizon.yml

on: pull_request
Test (and push) verify-range image
1m 54s
Test (and push) verify-range image
Matrix: Integration tests
Fit to window
Zoom out
Zoom in

Annotations

13 errors and 3 warnings
Test (and push) verify-range image
Process completed with exit code 128.
Integration tests (ubuntu-20.04, 1.22, 12, 21): services/horizon/internal/httpx/rate_limiter.go#L43
cannot use lruCacheSize (constant 50000 of type int) as throttled.GCRAStore value in argument to throttled.NewGCRARateLimiter: int does not implement throttled.GCRAStore (missing method CompareAndSwapWithTTL)
Integration tests (ubuntu-20.04, 1.22, 12, 21)
Process completed with exit code 1.
Integration tests (ubuntu-22.04, 1.22, 16, 21)
The job was canceled because "ubuntu-20_04_1_22_12_21" failed.
Integration tests (ubuntu-22.04, 1.21, 12, 21)
The job was canceled because "ubuntu-20_04_1_22_12_21" failed.
Integration tests (ubuntu-20.04, 1.22, 16, 21)
The job was canceled because "ubuntu-20_04_1_22_12_21" failed.
Integration tests (ubuntu-22.04, 1.22, 12, 21)
The job was canceled because "ubuntu-20_04_1_22_12_21" failed.
Integration tests (ubuntu-22.04, 1.21, 16, 21)
The job was canceled because "ubuntu-20_04_1_22_12_21" failed.
Integration tests (ubuntu-20.04, 1.21, 16, 21)
The job was canceled because "ubuntu-20_04_1_22_12_21" failed.
Integration tests (ubuntu-20.04, 1.21, 16, 21): services/horizon/internal/httpx/rate_limiter.go#L43
cannot use lruCacheSize (constant 50000 of type int) as throttled.GCRAStore value in argument to throttled.NewGCRARateLimiter: int does not implement throttled.GCRAStore (missing method CompareAndSwapWithTTL)
Integration tests (ubuntu-20.04, 1.21, 16, 21)
Process completed with exit code 1.
Integration tests (ubuntu-20.04, 1.21, 12, 21)
The job was canceled because "ubuntu-20_04_1_22_12_21" failed.
Integration tests (ubuntu-20.04, 1.21, 12, 21)
The operation was canceled.
Test (and push) verify-range image
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
Integration tests (ubuntu-20.04, 1.22, 12, 21)
The following actions uses node12 which is deprecated and will be forced to run on node16: actions/setup-go@v2, actions/cache@v2. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/
Integration tests (ubuntu-20.04, 1.22, 12, 21)
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v3, actions/setup-go@v2, actions/cache@v2. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/