Skip to content

first pass at wiring up jito-plugin #423

first pass at wiring up jito-plugin

first pass at wiring up jito-plugin #423

Triggered via pull request October 20, 2023 17:40
Status Failure
Total duration 37m 14s
Artifacts

client-targets.yml

on: pull_request
Matrix: android
Matrix: ios
error_reporting  /  slack
error_reporting / slack
Fit to window
Zoom out
Zoom in

Annotations

7 errors
android (ubuntu-20.04, i686-linux-android)
Process completed with exit code 101.
android (ubuntu-20.04, armv7-linux-androideabi)
The job was canceled because "ubuntu-20_04_i686-linux-a" failed.
android (ubuntu-20.04, armv7-linux-androideabi)
The operation was canceled.
android (ubuntu-20.04, aarch64-linux-android)
The job was canceled because "ubuntu-20_04_i686-linux-a" failed.
android (ubuntu-20.04, aarch64-linux-android)
The operation was canceled.
android (ubuntu-20.04, x86_64-linux-android)
The job was canceled because "ubuntu-20_04_i686-linux-a" failed.
android (ubuntu-20.04, x86_64-linux-android)
The operation was canceled.