Add logic to reset the extra_reference_date
after a network unwrapping
#1215
test-build-push.yml
on: pull_request
Build Docker image and push to GitHub Container Registry
2m 30s
Matrix: pytest
Annotations
3 errors
macos-14 • Latest
Process completed with exit code 1.
|
ubuntu-latest • Latest
The job was canceled because "macos-14_Latest_isce3_das" failed.
|
ubuntu-latest • Latest
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
isce-framework~dolphin~KUVB6P.dockerbuild
|
64.6 KB |
|