Skip to content

chore(deps): lock file maintenance #3999

chore(deps): lock file maintenance

chore(deps): lock file maintenance #3999

Triggered via push December 4, 2024 20:35
Status Failure
Total duration 1m 2s
Artifacts

node-ci.yml

on: push
Matrix: verify-matrix
release  /  release
release / release
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 2 warnings
verify-matrix (18)
Process completed with exit code 1.
verify-matrix (20)
The job was canceled because "_18" failed.
verify-matrix (20)
Process completed with exit code 1.
verify
Process completed with exit code 1.
verify-matrix (18.0.0)
The job was canceled because "_18" failed.
verify-matrix (18.0.0)
The operation was canceled.
verify-matrix (16.14.0)
The job was canceled because "_18" failed.
verify-matrix (18)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
verify
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636