Skip to content

Merge SVN 4981

Merge SVN 4981 #110

Triggered via push September 27, 2024 09:43
Status Failure
Total duration 45m 24s
Artifacts 4
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (windows-latest, db, release, mingw64, x86_64)
Process completed with exit code 2.
build (windows-latest, db, debug, mingw64, x86_64)
Process completed with exit code 2.
build (windows-latest, db, debug, ucrt64, ucrt-x86_64)
The job running on runner GitHub Actions 18 has exceeded the maximum execution time of 45 minutes.
build (windows-latest, db, debug, ucrt64, ucrt-x86_64)
The operation was canceled.
build (windows-latest, db, debug, clang64, clang-x86_64)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 45 minutes.
build (windows-latest, db, debug, clang64, clang-x86_64)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
GnuCOBOL_mingw-mingw64-debug.tar
148 MB
GnuCOBOL_mingw-mingw64-release.tar
136 MB
testsuite-mingw64-debug.log
31.2 KB
testsuite-mingw64-release.log
31 KB