Skip to content

Merge SVN 4985

Merge SVN 4985 #108

Triggered via push September 26, 2024 16:03
Status Failure
Total duration 45m 26s
Artifacts 6
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (windows-latest, db, debug, clang64, clang-x86_64)
Process completed with exit code 2.
build (windows-latest, db, debug, ucrt64, ucrt-x86_64)
Process completed with exit code 2.
build (windows-latest, db, debug, mingw64, x86_64)
Process completed with exit code 2.
build (windows-latest, db, release, mingw64, x86_64)
The job running on runner GitHub Actions 18 has exceeded the maximum execution time of 45 minutes.
build (windows-latest, db, release, mingw64, x86_64)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
GnuCOBOL_mingw-clang64-debug.tar
304 MB
GnuCOBOL_mingw-mingw64-debug.tar
148 MB
GnuCOBOL_mingw-ucrt64-debug.tar
147 MB
testsuite-clang64-debug.log
52.2 KB
testsuite-mingw64-debug.log
31.3 KB
testsuite-ucrt64-debug.log
31.2 KB