Skip to content

Fix 1.6 bundle failure due to redshift-connector==2.0.915 #398

Fix 1.6 bundle failure due to redshift-connector==2.0.915

Fix 1.6 bundle failure due to redshift-connector==2.0.915 #398

Triggered via pull request October 31, 2023 21:02
@mikealfaremikealfare
opened #94
Status Cancelled
Total duration 28s
Artifacts

integration.yml

on: pull_request_target
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
macos-latest 3.10 Test
Canceling since a higher priority waiting request for 'Bundle Integration Tests-pull_request_target-1.6/dbt-redshift/redshift-connector-2.0.915' exists
macos-latest 3.10 Test
A task was canceled.
macos-latest 3.8 Test
Canceling since a higher priority waiting request for 'Bundle Integration Tests-pull_request_target-1.6/dbt-redshift/redshift-connector-2.0.915' exists
macos-latest 3.8 Test
Process completed with exit code 127.
macos-latest 3.8 Test
The operation was canceled.
ubuntu-latest 3.8 Test
Canceling since a higher priority waiting request for 'Bundle Integration Tests-pull_request_target-1.6/dbt-redshift/redshift-connector-2.0.915' exists
ubuntu-latest 3.8 Test
Process completed with exit code 127.
ubuntu-latest 3.8 Test
The operation was canceled.
ubuntu-latest 3.10 Test
Canceling since a higher priority waiting request for 'Bundle Integration Tests-pull_request_target-1.6/dbt-redshift/redshift-connector-2.0.915' exists
ubuntu-latest 3.10 Test
Process completed with exit code 127.
ubuntu-latest 3.10 Test
The operation was canceled.