Skip to content

#857: conditionally rely on PARALLEL WORKSHARE #641

#857: conditionally rely on PARALLEL WORKSHARE

#857: conditionally rely on PARALLEL WORKSHARE #641

Triggered via pull request November 20, 2024 14:36
@hfphfp
synchronize #859
hfp:issue857
Status Failure
Total duration 6h 15m 53s
Artifacts

testing-macos.yml

on: pull_request
Matrix: build-and-test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
build-and-test (MPI=ON, OPENMP=ON, SMM=blas, accelerate, openmpi)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 360 minutes.
build-and-test (MPI=ON, OPENMP=ON, SMM=blas, accelerate, openmpi)
The operation was canceled.
build-and-test (MPI=ON, OPENMP=ON, SMM=blas, openblas, openmpi)
The job was canceled because "MPI_ON_OPENMP_ON_SMM_blas" failed.
build-and-test (MPI=ON, OPENMP=ON, SMM=blas, openblas, openmpi)
The operation was canceled.