Skip to content

Rust 1.79

Rust 1.79 #146

Triggered via pull request June 23, 2024 14:09
@chippchipp
synchronize #117
rust_1.79
Status Cancelled
Total duration 7m 40s
Artifacts

pr.yml

on: pull_request
Matrix: test-isabel-libs
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

13 errors
test (elisheba)
Process completed with exit code 1.
test (isabel)
The job was canceled because "elisheba" failed.
test (isabel)
Process completed with exit code 1.
test (elisa)
The job was canceled because "elisheba" failed.
test (elisa)
Process completed with exit code 1.
test (elizabeth)
The job was canceled because "elisheba" failed.
test (elizabeth)
Process completed with exit code 1.
test (alisa)
The job was canceled because "elisheba" failed.
test (alisa)
The operation was canceled.
test-isabel-libs (arm64, amd64)
The run was canceled by @chipp.
test-isabel-libs (arm64, amd64)
The operation was canceled.
test-isabel-libs (arm64, arm64)
The run was canceled by @chipp.
test-isabel-libs (arm64, arm64)
The operation was canceled.