chore: Configures renovate to cover v1.5; adds v1.5 scheduled CI runs #1375
Triggered via pull request
November 28, 2024 09:47
Status
Failure
Total duration
6h 13m 21s
Artifacts
1
main.yaml
on: pull_request
lint-report
/
lint-report
21s
static-analysis
/
static-analysis
25s
unit-tests-with-coverage
/
unit-tests
16s
check-libraries
/
check-libraries
3s
terraform-check
/
Check Terraform
6s
Matrix: CodeQL Analysis / CodeQL Analysis
Publish Charm
/
publish-charm
Publish Developer Charm To Branch
/
publish-charm
Annotations
2 errors and 1 warning
integration-test / integration-test
The job running on runner GitHub Actions 307 has exceeded the maximum execution time of 360 minutes.
|
integration-test / integration-test
The operation was canceled.
|
check-libraries / check-libraries
No lib folder detected. Skipping action.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
built-charm
Expired
|
19.4 MB |
|