Skip to content

chore: Configures renovate to cover v1.5; adds v1.5 scheduled CI runs #1375

chore: Configures renovate to cover v1.5; adds v1.5 scheduled CI runs

chore: Configures renovate to cover v1.5; adds v1.5 scheduled CI runs #1375

Triggered via pull request November 28, 2024 09:47
Status Failure
Total duration 6h 13m 21s
Artifacts 1

main.yaml

on: pull_request
lint-report  /  lint-report
21s
lint-report / lint-report
static-analysis  /  static-analysis
25s
static-analysis / static-analysis
unit-tests-with-coverage  /  unit-tests
16s
unit-tests-with-coverage / unit-tests
check-libraries  /  check-libraries
3s
check-libraries / check-libraries
terraform-check  /  Check Terraform
6s
terraform-check / Check Terraform
Matrix: CodeQL Analysis / CodeQL Analysis
build  /  build-charm-under-test
12m 7s
build / build-charm-under-test
integration-test  /  integration-test
6h 0m
integration-test / integration-test
Publish Charm  /  publish-charm
Publish Charm / publish-charm
Publish Developer Charm To Branch  /  publish-charm
Publish Developer Charm To Branch / publish-charm
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
integration-test / integration-test
The job running on runner GitHub Actions 307 has exceeded the maximum execution time of 360 minutes.
integration-test / integration-test
The operation was canceled.
check-libraries / check-libraries
No lib folder detected. Skipping action.

Artifacts

Produced during runtime
Name Size
built-charm Expired
19.4 MB