Skip to content

Another refactor to support latest updates in Bridgetown v2 #5

Another refactor to support latest updates in Bridgetown v2

Another refactor to support latest updates in Bridgetown v2 #5

Triggered via push May 6, 2024 20:58
Status Failure
Total duration 21s
Billable time 4m
Artifacts

tests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.0.5, 1.2.0)
The process '/opt/hostedtoolcache/Ruby/3.0.5/x64/bin/bundle' failed with exit code 6
build (3.1.3, 1.2.0)
The job was canceled because "_3_0_5_1_2_0" failed.
build (3.1.3, 1.2.0)
The process '/opt/hostedtoolcache/Ruby/3.1.3/x64/bin/bundle' failed with exit code 6
build (2.7.7, 1.2.0)
The job was canceled because "_3_0_5_1_2_0" failed.
build (2.7.7, 1.2.0)
The operation was canceled.
build (3.2.0, 1.2.0)
The job was canceled because "_3_0_5_1_2_0" failed.
build (3.2.0, 1.2.0)
The process '/opt/hostedtoolcache/Ruby/3.2.0/x64/bin/bundle' failed with exit code 6