Skip to content

Merge pull request #796 from aya-rs/integration-ebpf-bpf-arch #636

Merge pull request #796 from aya-rs/integration-ebpf-bpf-arch

Merge pull request #796 from aya-rs/integration-ebpf-bpf-arch #636

Triggered via push September 27, 2023 18:13
Status Failure
Total duration 6h 0m 28s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yml

on: push
Matrix: build-test-aya-bpf
Matrix: build-test-aya
Matrix: run-integration-test
build-workflow-complete
0s
build-workflow-complete
Fit to window
Zoom out
Zoom in

Annotations

2 errors
run-integration-test (ubuntu-22.04)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 360 minutes.
run-integration-test (ubuntu-22.04)
The operation was canceled.