Skip to content

Added management connections to be used with the periodic checks #218

Added management connections to be used with the periodic checks

Added management connections to be used with the periodic checks #218

Triggered via pull request October 4, 2023 13:59
Status Cancelled
Total duration 14m 24s
Artifacts

rust.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

14 errors
build (6.2.4, stable)
Process completed with exit code 2.
build (6.2.4, nightly)
Process completed with exit code 2.
build (6.2.4, beta)
Process completed with exit code 2.
build (6.2.4, 1.63.0)
Process completed with exit code 2.
build (7.2.0, beta)
The run was canceled by @barshaul.
build (7.2.0, beta)
The operation was canceled.
build (7.2.0, 1.63.0)
The run was canceled by @barshaul.
build (7.2.0, 1.63.0)
The operation was canceled.
build (7.2.0, nightly)
The run was canceled by @barshaul.
build (7.2.0, nightly)
The operation was canceled.
benchmark
The run was canceled by @barshaul.
benchmark
The operation was canceled.
build (7.2.0, stable)
The run was canceled by @barshaul.
build (7.2.0, stable)
The operation was canceled.