Added management connections to be used with the periodic checks #218
Triggered via pull request
October 4, 2023 13:59
Status
Cancelled
Total duration
14m 24s
Artifacts
–
rust.yml
on: pull_request
lint
35s
benchmark
14m 14s
Matrix: build
Annotations
14 errors
build (6.2.4, stable)
Process completed with exit code 2.
|
build (6.2.4, nightly)
Process completed with exit code 2.
|
build (6.2.4, beta)
Process completed with exit code 2.
|
build (6.2.4, 1.63.0)
Process completed with exit code 2.
|
build (7.2.0, beta)
The run was canceled by @barshaul.
|
build (7.2.0, beta)
The operation was canceled.
|
build (7.2.0, 1.63.0)
The run was canceled by @barshaul.
|
build (7.2.0, 1.63.0)
The operation was canceled.
|
build (7.2.0, nightly)
The run was canceled by @barshaul.
|
build (7.2.0, nightly)
The operation was canceled.
|
|
benchmark
The operation was canceled.
|
build (7.2.0, stable)
The run was canceled by @barshaul.
|
build (7.2.0, stable)
The operation was canceled.
|