fix: initialize metrics client for connector builder server (#14872) #7370
gradle.yml
on: push
Detect Modified Files
5s
Ensure all required Docker images exist on Dockerhub
10s
Notify Slack Channel on Build Failures
7s
Notify Slack Channel on Build Fixes
0s
Annotations
2 errors and 5 warnings
Platform: Build
/storage
|
Platform: Build
No space left on device : '/home/runner/runners/2.321.0/_diag/blocks/f391ed40-92ee-4e00-bbeb-ea178c181906_328e70c5-7d12-5e8c-26ee-8c14ac49cdf3.4'
|
Detect Modified Files
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Ensure all required Docker images exist on Dockerhub
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Platform: Build
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
Platform: Build
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
Notify Slack Channel on Build Failures
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|