Skip to content

build(deps): bump the prod group with 7 updates #2047

build(deps): bump the prod group with 7 updates

build(deps): bump the prod group with 7 updates #2047

Triggered via pull request October 28, 2024 15:48
Status Failure
Total duration 3m 25s
Billable time 8m
Artifacts

ci-build-crates.yml

on: pull_request
Generate crates matrix
19s
Generate crates matrix
Check crates matrix
3s
Check crates matrix
Matrix: build
Open or update issues for building crates individually failures
0s
Open or update issues for building crates individually failures
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Build zebra-utils crate
Process completed with exit code 101.
Build zebrad crate
The job was canceled because "zebra-utils" failed.
Build zebrad crate
The operation was canceled.
Build zebra-script crate
The job was canceled because "zebra-utils" failed.
Build zebra-script crate
The operation was canceled.
Build zebra-state crate
The job was canceled because "zebra-utils" failed.
Build zebra-state crate
The operation was canceled.