CI workflow tweaks, action updates - pt 2 #7518
Triggered via pull request
February 15, 2024 04:47
Status
Cancelled
Total duration
4m 58s
Artifacts
–
CI_ubuntu.yml
on: pull_request
Matrix: ubuntu-build
Package Source (Ubuntu 22.04) [GCC]
4m 48s
Matrix: upload-debug-symbols
Annotations
10 errors
Ubuntu 20.04 [Clang]
The run was canceled by @past-due.
|
Ubuntu 20.04 [Clang]
The operation was canceled.
|
Ubuntu 22.04 [GCC]
The run was canceled by @past-due.
|
Ubuntu 22.04 [GCC]
The operation was canceled.
|
Ubuntu 20.04 [GCC]
The run was canceled by @past-due.
|
Ubuntu 20.04 [GCC]
The operation was canceled.
|
Ubuntu 22.04 [Clang]
The run was canceled by @past-due.
|
Ubuntu 22.04 [Clang]
The operation was canceled.
|
Package Source (Ubuntu 22.04) [GCC]
The run was canceled by @past-due.
|
Package Source (Ubuntu 22.04) [GCC]
The operation was canceled.
|