chore(deps): update dependency ws to v8 [security] #5641
build-and-test-pr.yml
on: pull_request
Turbo Affected
/
Determine Affected
26s
Matrix: Test Mobile E2E / Ledger Live Mobile - Android Detox Tests
Matrix: Build Desktop / build-desktop-app
Build Mobile
/
Build LLM | Android
6m 54s
Build Mobile
/
Build LLM | iOS
5m 31s
Test Mobile
/
LLM CodeCheck
6m 14s
Test Design System
/
Design System Tests
1m 5s
Test Desktop
/
LLD Code Checks
7m 5s
Test Desktop
/
Desktop Unit Tests
4m 8s
Test Libraries
/
Test Libraries
1m 13s
Test Libraries
/
Codecheck Libraries
4m 7s
Test Libraries
/
Test Docs
1m 44s
Test Mobile E2E
/
Allure Reports Export on Server
0s
Matrix: Test Mobile E2E / Upload to Xray
Test Mobile E2E
/
Allure Reports Export on Server
0s
OK
0s
Annotations
15 errors and 1 warning
Test Mobile / LLM CodeCheck
Process completed with exit code 1.
|
Build Desktop / Build LLD | win
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Build Desktop / Build LLD | win
The operation was canceled.
|
Build Desktop / Build LLD | mac
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Build Desktop / Build LLD | mac
The operation was canceled.
|
Test Desktop / LLD Code Checks
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Test Desktop / LLD Code Checks
The operation was canceled.
|
Test Mobile E2E / Ledger Live Mobile - Android Detox Tests (1, 1)
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Test Mobile E2E / Ledger Live Mobile - Android Detox Tests (1, 1)
The operation was canceled.
|
Build Mobile / Build LLM | Android
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Build Mobile / Build LLM | Android
The operation was canceled.
|
Test Desktop / Desktop Tests E2E (Ubuntu)
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Test Desktop / Desktop Tests E2E (Ubuntu)
The operation was canceled.
|
Test Mobile E2E / LLM - iOS Detox Tests
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Test Mobile E2E / LLM - iOS Detox Tests
The operation was canceled.
|
Test Mobile / LLM CodeCheck
No files were found with the provided path: /home/runner/work/ledger-live/ledger-live/apps/ledger-live-mobile/lint-mobile.json. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
2.94.0-sha.97fadb52bf6cb0f84d87357d9720a064970746ac-linux-x86_64.AppImage
|
181 MB |
|
ios-test-artifacts
|
606 Bytes |
|
linux-js-bundle-metafiles
|
635 KB |
|
mobile.metafile.json
|
213 Bytes |
|
outputs-codecheck
|
298 Bytes |
|
outputs-test-libraries
|
157 Bytes |
|
outputs-test-ui
|
165 Bytes |
|