Skip to content

elastic scaling RFC 103 end-to-end test (#6452) #1

elastic scaling RFC 103 end-to-end test (#6452)

elastic scaling RFC 103 end-to-end test (#6452) #1

Triggered via push December 18, 2024 09:33
Status Failure
Total duration 1d 6h 19m 45s
Artifacts

build-misc.yml

on: push
preflight  /  preflight
8s
preflight / preflight
preflight  /  ci-versions
55s
preflight / ci-versions
build-runtimes-polkavm
0s
build-runtimes-polkavm
build-subkey
0s
build-subkey
All build misc jobs passed
0s
All build misc jobs passed
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 5 warnings
build-runtimes-polkavm
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
build-subkey
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
All build misc jobs passed
Process completed with exit code 1.
preflight / preflight
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
preflight / preflight
Unable to locate the commit sha: 8d4138f77106a6af49920ad84f3283f696f3f905
preflight / preflight
Previous commit 8d4138f77106a6af49920ad84f3283f696f3f905 is not valid. Using parent commit.
preflight / ci-versions
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
All build misc jobs passed
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636