Add this suggestion to a batch that can be applied as a single commit.
This suggestion is invalid because no changes were made to the code.
Suggestions cannot be applied while the pull request is closed.
Suggestions cannot be applied while viewing a subset of changes.
Only one suggestion per line can be applied in a batch.
Add this suggestion to a batch that can be applied as a single commit.
Applying suggestions on deleted lines is not supported.
You must change the existing code in this line in order to create a valid suggestion.
Outdated suggestions cannot be applied.
This suggestion has been applied or marked resolved.
Suggestions cannot be applied from pending reviews.
Suggestions cannot be applied on multi-line comments.
Suggestions cannot be applied while the pull request is queued to merge.
Suggestion cannot be applied right now. Please check back later.
Welcome to Renovate! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin.
🚦 To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged.
Detected Package Files
WORKSPACE
(bazel).bazelversion
(bazelisk)build/docker/Dockerfile.ubuntu
(dockerfile)build/docker/devcontainer.dockerfile
(dockerfile)Configuration Summary
Based on the default config's presets, Renovate will:
fix
for dependencies andchore
for all others if semantic commits are in use.node_modules
,bower_components
,vendor
and various test/tests (except for nuget) directories.🔡 Do you want to change how Renovate upgrades your dependencies? Add your custom config to
renovate.json
in this branch. Renovate will update the Pull Request description the next time it runs.What to Expect
With your current configuration, Renovate will create 18 Pull Requests:
Update com_google_absl digest to 940e0ec
renovate/com_google_absl-digest
master
940e0ec36afbc7acf5de31167d4820d274d28c92
Update com_google_googleapis digest to 7d0c6be
renovate/com_google_googleapis-digest
master
7d0c6bee2517d77635beb2a1dd6d6e7d4d943512
Update com_google_zetasql digest to a516c6b
renovate/com_google_zetasql-digest
master
a516c6b26d183efc4f56293256bba92e243b7a61
Update com_googlesource_code_re2 digest to 6dcd83d
renovate/com_googlesource_code_re2-digest
master
6dcd83d60f7944926bfd308cc13979fc53dd69ca
Update com_googlesource_code_riegeli digest to a34c636
renovate/com_googlesource_code_riegeli-digest
master
a34c636741713ace3cd4b9dfe2d6f5ba681816bb
Update upb digest to 014cdfb
renovate/upb-digest
master
014cdfba690973b21cd5a1147bf51cac6cfb89c2
Update dependency bazel to v6.5.0
renovate/bazel-6.x
master
6.5.0
Update dependency com_github_grpc_grpc to v1.68.2
renovate/com_github_grpc_grpc-1.x
master
v1.68.2
Update dependency com_google_googletest to v1.15.2
renovate/com_google_googletest-1.x
master
v1.15.2
Update dependency com_google_protobuf to v4.25.5
renovate/com_google_protobuf-4.x
master
v4.25.5
Update dependency io_grpc_grpc_java to v1.69.0
renovate/grpc-java-monorepo
master
v1.69.0
Update dependency lz4 to v1.10.0
renovate/lz4-1.x
master
v1.10.0
Update dependency bazel to v8
renovate/bazel-8.x
master
8.0.0
Update dependency com_google_protobuf to v29
renovate/com_google_protobuf-29.x
master
v29.1
Update dependency net.java.dev.javacc:javacc to v7
renovate/net.java.dev.javacc-javacc-7.x
master
7.0.13
Update dependency rules_jvm_external to v6
renovate/rules_jvm_external-6.x
master
6.6
Update dependency rules_proto to v7
renovate/rules_proto-7.x
master
7.0.2
Update ubuntu Docker tag to v24
renovate/ubuntu-24.x
master
24.04
🚸 Branch creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or overwhelm the project. See docs for
prhourlylimit
for details.❓ Got questions? Check out Renovate's Docs, particularly the Getting Started section.
If you need any further assistance then you can also request help here.
This PR was generated by Mend Renovate. View the repository job log.