Skip to content
This repository has been archived by the owner on Aug 9, 2019. It is now read-only.

Configure Renovate #1

Open
wants to merge 1 commit into
base: master
Choose a base branch
from
Open

Configure Renovate #1

wants to merge 1 commit into from

Conversation

renovate[bot]
Copy link

@renovate renovate bot commented Sep 22, 2018

Welcome to Renovate! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin.

🚦 To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged.


Detected Package Files

  • package.json (npm)

Configuration Summary

Based on the default config's presets, Renovate will:

  • Start dependency updates only once this Configure Renovate PR is merged
  • Separate major versions of dependencies into individual branches/PRs
  • Do not separate patch and minor upgrades into separate PRs for the same dependency
  • Upgrade to unstable versions only if the existing version is unstable
  • Raise PRs immediately (after branch is created)
  • Use renovate/ as prefix for all branch names
  • If semantic commits detected, use semantic commit type fix for dependencies and chore for all others
  • Keep existing branches updated even when not scheduled
  • Disable automerging feature - wait for humans to merge all PRs
  • Ignore node_modules, bower_components, vendor and various test/tests directories
  • Update existing lock files only when package.json is modified
  • Autodetect whether to pin dependencies or maintain ranges
  • Rate limit PR creation to a maximum of two per hour
  • Limit to maximum 20 concurrent Renovate PRs at any time
  • Group known monorepo packages together
  • Use curated list of recommended non-monorepo package groupings

🔡 Would you like to change the way Renovate is upgrading your dependencies? Simply edit the renovate.json in this branch with your custom config and the list of Pull Requests in the "What to Expect" section below will be updated the next time Renovate runs.


What to Expect

With your current configuration, Renovate will create 9 Pull Requests:

Pin dependencies
Update dependency execa to v0.11.0
  • Schedule: "at any time"
  • Branch name: renovate/execa-0.x
  • Upgrade execa to 0.11.0
Update dependency tempy to v0.2.1
  • Schedule: "at any time"
  • Branch name: renovate/tempy-0.x
  • Upgrade tempy to 0.2.1
Update dependency chalk to v2
  • Schedule: "at any time"
  • Branch name: renovate/chalk-2.x
  • Upgrade chalk to 2.4.1
Update dependency conf to v2
  • Schedule: "at any time"
  • Branch name: renovate/conf-2.x
  • Upgrade conf to 2.1.0
Update dependency execa to v1
  • Schedule: "at any time"
  • Branch name: renovate/execa-1.x
  • Upgrade execa to 1.0.0
Update dependency globby to v8
  • Schedule: "at any time"
  • Branch name: renovate/globby-8.x
  • Upgrade globby to 8.0.1
Update dependency inquirer to v6
  • Schedule: "at any time"
  • Branch name: renovate/inquirer-6.x
  • Upgrade inquirer to 6.2.0
Update dependency meow to v5
  • Schedule: "at any time"
  • Branch name: renovate/meow-5.x
  • Upgrade meow to 5.0.0

🚸 Branch creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or spam the project. See: prHourlyLimit.


❓ If you have any questions, try reading the Docs, particularly the Getting Started section.
Also, you can post questions about your config in Renovate's Config Help repository.


This PR has been generated by Renovate Bot. View repository job log here.

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

1 participant