[test optimization] Add Dynamic Instrumentation to mocha retries #15882
project.yml
on: pull_request
Matrix: integration-ci
Matrix: integration-cypress
Matrix: integration-guardrails-unsupported
Matrix: integration-guardrails
Matrix: integration
Annotations
8 errors
lint:
packages/datadog-plugin-mocha/src/index.js#L412
'_setProbePromise' is assigned a value but never used
|
lint
Process completed with exit code 1.
|
integration-ci (18, jest)
Process completed with exit code 2.
|
integration-ci (latest, jest)
Process completed with exit code 2.
|
integration-ci (18, playwright)
The job was canceled because "_18_jest" failed.
|
integration-ci (18, playwright)
The operation was canceled.
|
integration-ci (latest, playwright)
The job was canceled because "_18_jest" failed.
|
integration-ci (latest, playwright)
The operation was canceled.
|