Skip to content

Ebola model updates #51

Ebola model updates

Ebola model updates #51

Triggered via push December 4, 2024 15:55
Status Failure
Total duration 7m 32s
Artifacts

test_package.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 1 warning
test (ubuntu-latest, 3.9)
Process completed with exit code 1.
test (windows-latest, 3.10)
The job was canceled because "ubuntu-latest_3_9" failed.
test (windows-latest, 3.10)
The operation was canceled.
test (windows-latest, 3.11)
The job was canceled because "ubuntu-latest_3_9" failed.
test (windows-latest, 3.11)
The operation was canceled.
test (ubuntu-latest, 3.10)
The job was canceled because "ubuntu-latest_3_9" failed.
test (ubuntu-latest, 3.10)
The operation was canceled.
test (ubuntu-latest, 3.11)
The job was canceled because "ubuntu-latest_3_9" failed.
test (ubuntu-latest, 3.11)
The operation was canceled.
test (windows-latest, 3.9)
The job was canceled because "ubuntu-latest_3_9" failed.
test (windows-latest, 3.9)
The operation was canceled.
test (ubuntu-latest, 3.9)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636