Locate the two hosts with the specified hostnames (file 300), which correspond to the target power grid substations. When you've found them, cut the power by writing a value of 0 to #POWR.
For more information see "Network Exploration: Geographic Information Systems" in the second issue of the zine.
XA (global)
GRAB 300
COPY F X
DROP
LINK 800
LINK 800
LINK 800
MARK DUPE
REPL CHECK
LINK 802
JUMP DUPE
MARK CUT_POWER
COPY M #POWR
HALT
MARK WALK
LINK 801
MARK CHECK
HOST T
TEST X = T
TJMP CUT_POWER
JUMP WALK
XB (global)
NOOP
NOOP
NOOP
GRAB 300
SEEK 1
COPY F X
DROP
LINK 800
LINK 800
LINK 800
MARK DUPE
REPL CHECK
LINK 802
JUMP DUPE
MARK CUT_POWER
COPY 0 M
COPY 0 #POWR
HALT
MARK WALK
LINK 801
MARK CHECK
HOST T
TEST X = T
TJMP CUT_POWER
JUMP WALK
Cycles | Size | Activity |
---|---|---|
44 | 45 | 44 |