You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
"We further assume that the M V2I links (uplink considered) have been preassigned orthogonal spectrum sub-bands with fixed transmission power, i.e., the mth V2I link occupies the mth sub-band"
#28
Open
cwangstive opened this issue
Dec 5, 2022
· 0 comments
梁老师您好,文章假设“每条V2I链路都被预先分配了具有固定传输功率的正交频谱子带”,由于车辆处于移动状态,到基站的距离时远时近,是否应在总功率一定的条件下,考虑动态分配功率。梁老师,文章做这样的假设的原因是什么呢,请您指点一下,上述我这样的考虑是否合理、是否必要?十分感谢您,期待您的回复。
The text was updated successfully, but these errors were encountered: