-
Notifications
You must be signed in to change notification settings - Fork 0
/
test.xml
15 lines (14 loc) · 928 Bytes
/
test.xml
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
<?xml version="1.0" encoding="UTF-8"?>
<projects>
<project>
<title>Sample Project Title</title>
<description>This project consisted of renovating a historic 3-story admissions building and construction of a new 2-story addition. The addition provides new offices on the lower level, along with a student, family, and alumni waiting area on the main level. The first floor plan was reconfigured creating a new main entrance portico with a direct path to the grand reception area. The construction schedule was compressed from the original 8 month duration to a 6 month period to open in time for the School's peak admission season; while remaining 11% under budget. </description>
<thumbnail><img src="img/thumbnail.png" /></thumbnail>
<gallery>
<img src="img/gallery1.png" />
<img src="img/gallery2.png" />
<img src="img/gallery3.png" />
<img src="img/gallery4.png" />
</gallery>
</project>
</projects>