chore(deps): update actions/setup-go action to v5.0.1 #1543
build.yml
on: pull_request
Matrix: build
build-status
0s
Annotations
2 errors and 2 warnings
build (1.21)
The job running on runner GitHub Actions 29 has exceeded the maximum execution time of 360 minutes.
|
build (1.21)
The operation was canceled.
|
build (1.22)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
build (1.21)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|