Feature/celo cip 64 support #11
on-pull-request.yml
on: pull_request
Verify
/
Build
55s
Matrix: Verify / Types
Annotations
6 errors and 5 warnings
Size
Size limit has been exceeded.
|
Verify / Test (http, 1, 3)
Final attempt failed. Child_process exited with error code 1
|
Verify / Test (http, 2, 3)
The job was canceled because "http_1_3" failed.
|
Verify / Test (http, 2, 3)
The operation was canceled.
|
Verify / Test (http, 3, 3)
The job was canceled because "http_1_3" failed.
|
Verify / Test (http, 3, 3)
The operation was canceled.
|
Size
The following actions uses node12 which is deprecated and will be forced to run on node16: andresz1/size-limit-action@master. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/
|
Verify / Test (http, 1, 3)
Attempt 1 failed. Reason: Child_process exited with error code 1
|
Verify / Test (http, 1, 3)
Attempt 2 failed. Reason: Child_process exited with error code 1
|
Verify / Test (http, 2, 3)
Attempt 1 failed. Reason: Child_process exited with error code 1
|
Verify / Test (http, 2, 3)
Attempt 2 failed. Reason: Child_process exited with error code 1
|